Agenda Day Two

CONFERENCE DAY TWO
TUESDAY 26th OCTOBER 2010

DAY ONE | DAY TWO

 

830 Breakfast: Enjoy a big BBQ breakfast with the speakers and fellow delegates!
Meet at the exhibition area

9:30 Opening remarks from the morning Chair:
Jim Middleton, Chief Engineer - LW Mines, BHPBilliton

9:40 Development improvements through automating the cutting cycle of ABM25 miners

  • Seeking opportunity for operational improvements through technology
  • The challenge: Why develop the autocut system
  • The "Autocut" sequence: How it works
  • Rolling out the "Autocut" project: How the project was implemented
  • Closing the loop: Monitoring and continuous refi nement of the “autocut” system
  • Outline how the system works, how it was implemented and cemented into the development process

Bruce Davies, Services Electrical Engineer, Centennial Coal Mandalong

10:20 CASE STUDY: Developing the Carborough Downs Longwall Mine
Randall Freeman, General Manager, Vale Carborough Downs Broadlea
Richard Eveleigh, Managing Director, Inbye

11:00 Morning tea break

11.30 Equipment innovation and technology

Consider existing projects and answer:

  • Why go to heavier Install and recovery equipment?
  • The Safe use of Diesel Equipment in low height seems
  • Why develop an underground MEWP (Mobile Elevated Work Platform)?

Analyse the need to develop new technology and equipment for Underground Coal Mines:

  • Who was asking for this technology?
  • The direction of underground Hire Equipment within the Coal Industry

Mark Doyle, General Manager, Underground Division, BIS Industrial Logistics

12:00 CASE STUDY: Moranbah North 1750 Tonne Longwall
David Sykes, GM Strategic Projects, AAMC

12:30 Process Based Production Management System using Electronic Machine Monitoring and Ruggedized PDA Technology

Paper will examine:

  • How Process Based Management can significantly increase productivity
  • Case Studies of systems developed by MCS, viewing results and optimised productivity

Chris Wilkinson, Managing Director, Mining Consultancy Services

1:00 Lunch

2:10 Introduction of afternoon Chair
Bob Miller, General Manager Mining Improvement, Solid Energy NZ

2:20 CASE STUDY: Longwall performance improvement at Kestrel Mine
John Coughlan, Plant and Equipment Manager, Rio Tinto Kestrel Mine

3:00 CASE STUDY: Clarence Colliery - Subsidence management
Allison Golsby, Technical Services Superintendent, Clarence Colliery, Centennial Coal

3:30 Afternoon tea break

4:00 Unleashing the potential of coal mine gas and coal seam gas in the Illawarra Coal Measures
Chris Rogers, Chief Operating Officer, Apex Energy NL

4:30 Groundwater management for longwall coal mining

  • Operational and compliance issues for existing operations and solutions
  • Groundwater information which can be gathered in a cost effective manner to support an expansion of mining
  • Case study from an existing longwall operation

Peter Dundon, Senior Principal Hydrogeologist, Aquaterra

5:00 Closing remarks from the Chair
Close of conference

Document Actions

Datamonitor Reports

 
Sponsors

Platinum Sponsor

Joy Mining Machinery, Platinum Sponsor, Longwall 2010 Conference


Golf Day Sponsor

Industrial Logisticsg, Golf Day Sponsor, Longwall 2010 Conference


Silver Sponsor

Mining Consultancy Services, Silver Sponsor, Longwall Conference 2010


Delegate Satchel Sponsor

Sandvik, Delegate Satchel Sponsor, Longwall Conference 2010


Lunch Sponsors

HMI, Lunch Sponsor, Longwall 2010 conference

  QUARRY MINING, Lunch Sponsor, Longwall 2010 conference


Delegate Badges & Lanyards Sponsor

Parker, Delegate Badges & Lanyards Sponsor, Longwall 2010 conference